[1]
Mohd.Rahim, F., Ling, K.G., Zainon, N. and Mohd Yusof, N.S. 2025. MINIMIZING THE RISK OF COST OVERRUN IN BUILDING CONSTRUCTION PROJECT DURING PRE-CONTRACT STAGE. PLANNING MALAYSIA. 23, 39 (Dec. 2025). DOI:https://doi.org/10.21837/pm.v23i39.1899.