[1]
Mohd Hussain, M.R., Zen, I., Muda, R.S., Thiruchelvam, S., Tukiman, I. and Ahmad Shazili, A.N. 2018. COMMUNITY AWARENESS ON THE IMPLEMENTATION OF EARLY WARNING SYSTEM AT TENAGA NASIONAL BERHAD SULTAN ABU BAKAR HYDROELECTRIC SCHEME, LEMBAH BERTAM, CAMERON HIGHLAND. PLANNING MALAYSIA. 16, 5 (Jul. 2018). DOI:https://doi.org/10.21837/pm.v16i5.419.