Mohd.Rahim, F., Ling, K. G., Zainon, N., & Mohd Yusof, N. S. (2025). MINIMIZING THE RISK OF COST OVERRUN IN BUILDING CONSTRUCTION PROJECT DURING PRE-CONTRACT STAGE. PLANNING MALAYSIA, 23(39). https://doi.org/10.21837/pm.v23i39.1899