Mohd.Rahim, F.A., Kah Gah Ling, Nurshuhada Zainon, and Nurul Safwah Mohd Yusof. 2025. “MINIMIZING THE RISK OF COST OVERRUN IN BUILDING CONSTRUCTION PROJECT DURING PRE-CONTRACT STAGE”. PLANNING MALAYSIA 23 (39). https://doi.org/10.21837/pm.v23i39.1899.