Mohd.Rahim, F., Ling, K. G., Zainon, N. and Mohd Yusof, N. S. (2025) “MINIMIZING THE RISK OF COST OVERRUN IN BUILDING CONSTRUCTION PROJECT DURING PRE-CONTRACT STAGE”, PLANNING MALAYSIA, 23(39). doi: 10.21837/pm.v23i39.1899.