RE-APPRAISING LAND DEVELOPMENT APPROVAL PROCEDURE THROUGH SURRENDER AND RE-ALIENATION MECHANISM IN JOHOR

Authors

  • Amirul Haffiz Ariff Faculty of Built Environment and Surveying, UNIVERSITI TEKNOLOGI MALAYSIA
  • Salfarina Samsudin Faculty of Built Environment and Surveying, UNIVERSITI TEKNOLOGI MALAYSIA
  • Mohd Hamdan Ahmad Faculty of Built Environment and Surveying, UNIVERSITI TEKNOLOGI MALAYSIA

DOI:

https://doi.org/10.21837/pm.v19i18.1035

Keywords:

land development process, surrender and re-alienation, land development mechanism, delay, state authority income

Abstract

The surrender and re-alienation or ‘serah balik kurnia semula’ (SBKS) mechanism in Johor has remained essentially significant for the state authority income. On account of the delay issues that impacted processing agencies and related stakeholders particularly state authority, the purpose of this article is to study the process and procedure conducted by Pejabat Tanah Johor Bahru (PTJB) in processing SBKS applications through (i) Identifying issues and challenges of existing processes and procedures that prevent the application of approval to be done in a timely manner; and (ii) To propose recommendation towards simplification and time-saving approval processes and procedures of surrender and re-alienation applications. From the analysis, there were 11 delay issues found to complete the 20 steps of the process. Thus, recommendations of approval were suggested by approval agencies and related stakeholders conducted in several series of Focus Group Discussion (FGD) as efforts to mitigate the delay issues faced by both sectors and hence accelerate the development process and generate state authority income effectively.

Downloads

Download data is not yet available.

References

Abu Bakar Ibrahim (2008) Peranan perunding tanah dalam proses permohonan serah balik dan kurnia semula (SBKS) dalam negeri Johor. Universiti Teknologi Malaysia.

Amirul Haffiz, A. et al. (2019) Kompendium Tanah Johor. Johor, Malaysia: Pejabat Pengarah Tanah dan Galian Johor.

Awang, A. (1991) ‘Serah Balik Kurnia Semula Tanah Di Negeri Johor’. Edited by P. T. dan G. N. Johor. Johor Bahru, Johor, Malaysia: PTG Johor.

Azmi, R. et al. (2019) ‘Surrender And Re-Alienation Of Land In Johor, Malaysia: A Planning Tool And Mechanism For Sustainable Property Development’.

Bell, K. C. (2006) ‘World Bank Support for Land Administration and Management: Responding to the Challenges of the Millennium Development Goals’, The XXIII FIG Congress, (October 2006), pp. 1–13.

Chow, W. M. (1999) ‘The workflow system and its applications’, Production Planning and Control, 10(6), pp. 506–519. doi: 10.1080/095372899232803. DOI: https://doi.org/10.1080/095372899232803

Ellis, C. A. and Keddara, K. (2000) ‘A workflow change is a workflow’, in Business process management. Springer, Berlin, Heidelberg, pp. 201–217. doi: https://doi.org/10.1007/3-540-45594-9_13. DOI: https://doi.org/10.1007/3-540-45594-9_13

Ibrahim, R. and Norris Kweku, H. (2018) ‘Streamlining the Planning Approval Process for a Sustainable Urban Development-A Case Study for Unwinding Manmade Complexities’, Stud. Archit. Urban. Environ. Sci. J, 1(1), pp. 1–10. doi:10.22034/saues.2018.01.01.

Jaiya, A. (2017) ‘Pemajuan Tanah Melalui Peruntukan-peruntukan Khas (Seksyen 204A-H Kanun Tanah Negara 1965) - Suatu Pilihan’, Jurnal Pentadbiran Tanah.

Kementerian Perumahan dan Kerajaan Tempatan (2019) Manual OSC 3.0 Plus: Proses dan Prosedur Cadangan Pemajuan serta Perlaksanaan Pusat Setempat (OSC). First.

Putrajaya: Jabatan Kerajaan Tempatan, KPKT.

Marzukhi, M. A. et al. (2019) ‘One Stop Centre (Osc): Lessons On Best Practices In Planning System Delivery’, PLANNING MALAYSIA, 17(9). doi: DOI: https://doi.org/10.21837/pmjournal.v17.i9.590

21837/pmjournal.v17.i9.590.

Marzukhi, M. A., Omar, D. and Leh, O. L. H. (2012) ‘Re-appraising the Framework of Planning and Land Law as an Instrument for Sustainable Land Development in Malaysia’, Procedia - Social and Behavioral Sciences, 68, pp. 767–774. doi:10.1016/j.sbspro.2012.12.265. DOI: https://doi.org/10.1016/j.sbspro.2012.12.265

Pejabat Tanah dan Galian Johor (2021) Pentadbiran Tanah Johor, Piagam Pelanggan (Pembangunan Tanah). Available at: https://ptj.johor.gov.my/piagam-pelangganpembangunan-tanah/.

Seow, C. L. (2019) Surrender Back & Re-alienation (SBKS) Johor From Private Perspective. Johor, Malaysia: Mesra Ukur Sdn. Bh.

Siddiquee, N. A. (2008) ‘Service delivery innovations and governance: the Malaysian experience’, Transforming government: people, process and policy.

Subedi, G. P. (2016) ‘Land Administration and Its Impact on Economic Development’, p. 250.

Suhailizan, S. (2020) Kebenaran merancang & serah balik kurnia semula. Skudai, Johor: Universiti Teknologi Malaysia.

UNECE (1996) Land Administration Guidelines, United Nations. Available at: http://www.unece.org/fileadmin/DAM/hlm/documents/Publications/land.administration.guidelines.e.pdf.

Yeap, C. (2018) ‘Cover Story: Sizeable land income for states complicates housing issue’,

The Edge Malaysia. Available at: https://www.theedgemarkets.com/article/coverstory-sizeable-land-income-states-complicates-housing-issue.

Downloads

Published

2021-12-14

How to Cite

Ariff, A. H., Samsudin, S., & Ahmad, M. H. (2021). RE-APPRAISING LAND DEVELOPMENT APPROVAL PROCEDURE THROUGH SURRENDER AND RE-ALIENATION MECHANISM IN JOHOR. PLANNING MALAYSIA, 19(18). https://doi.org/10.21837/pm.v19i18.1035