INVESTIGATING THE CURRENT RISK MANAGEMENT PROCESS PRACTICE IN MALAYSIAN LANDSCAPE PLANNING PROJECTS

Authors

  • Adam Aruldewan S. Muthuveeran Faculty of Design and Architecture, UNIVERSITI PUTRA MALAYSIA
  • Osman Mohd Tahir Faculty of Design and Architecture, UNIVERSITI PUTRA MALAYSIA
  • Mohd Azren Hassan Faculty of Architecture, Planning and Surveying, UNIVERSITI TEKNOLOGI MARA
  • Izuandi Yin School of Housing Building and Planning, UNIVERSITI SAINS MALAYSIA

DOI:

https://doi.org/10.21837/pm.v20i20.1078

Keywords:

risk management, risk management process, landscape planning project

Abstract

The Malaysian landscape planning projects are dynamic, subjective, and fasttracked, causing multiple risks. Hence, risk management practice is needed to manage risks. However, the risk management process is not managed comprehensively despite the considerable capability of project practitioners to predict, analyse, and treat project risks, causing the project to underperform. This study has investigated the current risk management process in Malaysian landscape planning projects. Data were gathered through semi-structured interviews with twenty-four landscape architect practitioners from Klang Valley. The information from the interviews was analysed utilising the content and thematic analysis method. The six steps of the risk management process were not managed following the suggested methodology, whereby the procedure was carried out in an ad hoc, unstructured, and incomplete manner. This action has caused extensive risk impact which affected project performances. This finding will teach project practitioners to evaluate their current practice and recommend the adoption of formal risk management in landscape planning projects.

Downloads

Download data is not yet available.

References

Abdul-Rahman, Hamzah, Chen Wang, and Farhanim Sheik Mohamad. 2015. “Implementation of Risk Management in Malaysian Construction Industry: Case Studies.” Journal of Construction Engineering 2015(1):7. DOI: https://doi.org/10.1155/2015/192742

Adnan, Hamimah, and Muhammad Redza Rosman. 2018. “Risk Management in Turnkey Projects in Malaysia.” WSEAS Transactions on Business and Economics 15:35–43.

APM. 2010. Project Risk Analysis and Management Guide. 2nd ed. edited by APM Risk Management Specific Interest Group. Buckinghamshire: Association for Project Management. AS/NZS 4360:2004. 2004. “AS/NZS 4360/2004 Risk Management.” Computer Law 38.

ASLA. 2019. “American Society of Landscape Architects.” What Is Landscape? 6. Retrieved (https://www.asla.org/aboutlandscapearchitecture.aspx).

BS 6079-3:2000. 2000. Project Management - Part 3: Guide To The Management Of Business Related Project Risk. 1st ed. edited by P. M. Technical Committee MS/2. London W4 4AL, UK: British Standards Institution (BSI).

BS IEC 62198:2001. 2001. Project Risk Management - Application Guidelines. 1st ed. edited by Management Systems Sector Policy and Strategy Committee. London W4 4AL, UK: British Standards Institution (BSI).

CAN/CSA-Q850-97. 2002. Risk Management: Guideline for Decision-Makers. Vol. Raffirmd 2. Ontario, KIP 6N7: The Canadian Standards Association (CSA).

Chong, Noraini Omar, and Khairul Hisyam Kamarudin. 2018. “Disaster Risk Management In Malaysia: Issues And Challenges From The Perspective Of Agencies.” Planning Malaysia 16(1):105–17. DOI: https://doi.org/10.21837/pm.v16i5.415

Fadzil, Nur Syuhada, Nurazuwa Md Noor, and Ismail Abdul Rahman. 2017. “Need of Risk Management Practice amongst Bumiputera Contractors in Malaysia Construction Industries.” P. 7 in IOP Conference Series: Materials Science and Engineering. Vol. 271. DOI: https://doi.org/10.1088/1757-899X/271/1/012035

Godi, Donald H., and Troy D. Sibelius. 2012. “Project Risk Management: New Obstacles to Consider.” P. 5 in 2012 - ASLA Annual Meeting Presentation, Phoenix Convention Center. Arizona: American Society Of Landscape Architects (ASLA).

Hoon Leh, Oliver Ling, Zamila Zamri, Mohd Zamreen Mohd Amin, and Marlyana Azyyati Marzukhi. 2013. “User’s Preference And Perception On The Pedestrian Crossing In Malaysia: The Case Of Ampang Road, Kuala Lumpur.” Planning Malaysia. DOI: https://doi.org/10.21837/pm.v11i3.109

IEEE Std 1540-2001. 2001. IEEE Standard for Software Life Cycle Processes - Risk Management. NY 10016-5997: The Institute of Electrical and Electronics Engineers, Inc.

ISO 31000:2018. 2018. ISO 31000:2018 Risk Management - Guidelines. 2nd ed. edited by ISO/TC 262 Risk Management. Geneva 20: International Organization for Standardization (ISO).

Kang, Byung Gyoo, Mohamed Ashfaaq Fazlie, Boon Hoe Goh, Myung Kyu Song, and Cheng Zhang. 2015. “Current Practice of Risk Management in the Malaysia Construction Industry - The Process and Tools/Techniques.” International Journal of Structural and Civil Engineering Research 4(4):371–77. DOI: https://doi.org/10.18178/ijscer.4.4.371-377

Keers, Bianca B. M., and Paul C. van Fenema. 2018. “Managing Risks in Public-Private Partnership Formation Projects.” International Journal of Project Management 36(6):861–75. DOI: https://doi.org/10.1016/j.ijproman.2018.05.001

Maguire, Moira, and Brid Delahunt. 2017. “Doing a Thematic Analysis: A Practical, Step-by-Step.” The All Ireland Journal of Teaching and Learning in Higher Education 8(3):3351–33514.

Mayring, Philipp. 2014. Qualitative Content Analysis : Theoretical Foundation, Basic Procedures and Software Solution. Klagenfurt: Social Science Open Access Repository (SSOAR). DOI: https://doi.org/10.1007/978-94-017-9181-6_13

McNamara, Carter. 2017. Field Guide to Nonprofit Program Design, Marketing and Evaluation. 5th ed. Minnesota 55422-1508: Authenticity Consulting, LLC.

PD 6668:2000. 2000. Managing Risk for Corporate Governance. 1st ed. edited by M. Robbins and D. Smith. London W4 4AL: British Standards Institution (BSI).

PMI. 2017. A Guide To The Project Management Body Of Knowledge (PMBOK Guide). 6th ed. edited by PMBOK. Pennsylvania 19073-3299 USA: Project Management Institute, Inc.

S.Muthuveeran, Adam Aruldewan, Osman Mohd Tahir, Mohd Azren Hassan, and Hidayati Ramli. 2021. “Determining Controllability Level of Project Issues in Malaysian Landscape Architectural Projects.” Pp. 233–40 in EnvironmentBehaviour Proceedings Journal. Vol. 6. DOI: https://doi.org/10.21834/ebpj.v6i18.3053

S.Muthuveeran, Adam Aruldewan, Osman Mohd Tahir, Roziya Ibrahim, and Saipol Bari Abd-Karim. 2020. “Reviewing Risk Process Integration Effectiveness into Malaysia’s Landscape Architecture Project Lifecycle.” Environment-Behaviour Proceedings Journal (E-BPJ) 5(13):245–55. DOI: https://doi.org/10.21834/e-bpj.v5i13.1991

Tung, Yew Hou, Fah Choy Chia, and Felicia Yong Yan-Yan. 2021. “Exploring The Usage Of Digital Technologies For Construction Project Management.” Planning Malaysia. DOI: https://doi.org/10.21837/pm.v19i17.983

Willumsen, Pelle, Josef Oehmen, Verena Stingl, and Joana Geraldi. 2019. “Value Creation through Project Risk Management.” International Journal of Project Management 37(5):731–49. DOI: https://doi.org/10.1016/j.ijproman.2019.01.007

Downloads

Published

2022-04-18

How to Cite

S. Muthuveeran, A. A., Mohd Tahir, O., Hassan, M. A., & Yin, I. (2022). INVESTIGATING THE CURRENT RISK MANAGEMENT PROCESS PRACTICE IN MALAYSIAN LANDSCAPE PLANNING PROJECTS. PLANNING MALAYSIA, 20(20). https://doi.org/10.21837/pm.v20i20.1078

Most read articles by the same author(s)