INDUSTRIALISED BUILDING SYSTEM MODULAR SYSTEM (IBSMS): ADDRESSING MERITS AND CHALLENGES FOR SUSTAINABLE DEVELOPMENT SUCCESS

Authors

  • Norhafizah Yusop Department of Built Environment Studies and Technology, College of Built Environment, UNIVERSITI TEKNOLOGI MARA, PERAK BRANCH, MALAYSIA
  • Shahira Irdina Muhammad Nizam Department of Built Environment Studies and Technology, College of Built Environment, UNIVERSITI TEKNOLOGI MARA, PERAK BRANCH, MALAYSIA
  • Wan Norizan Wan Ismail Department of Built Environment Studies and Technology, College of Built Environment, UNIVERSITI TEKNOLOGI MARA, PERAK BRANCH, MALAYSIA
  • Siti Sarah Mat Isa Department of Built Environment Studies and Technology, College of Built Environment, UNIVERSITI TEKNOLOGI MARA, PERAK BRANCH, MALAYSIA
  • Norsyazwana Jenuwa Department of Built Environment Studies and Technology, College of Built Environment, UNIVERSITI TEKNOLOGI MARA, PERAK BRANCH, MALAYSIA

DOI:

https://doi.org/10.21837/pm.v22i31.1453

Keywords:

Sustainable Development, Industrialised Building System Modular System, Merits, Challenges

Abstract

In response to the current demand for an innovative construction design that offers shorter construction periods and cost-saving benefits, Malaysians are increasingly seeking alternative solutions for sustainable development. The Industrialised Building System Modular System (IBSMS) emerges as a promising sustainable approach for home design and has developed as a transformative approach in the construction industry, holding massive potential for sustainable development. Nevertheless, certain merits and challenges must be addressed to promote the widespread adoption and implementation of sustainable development within the Malaysian construction industry. To provides a complete analysis of the merits and challenges associated with IBSMS, a questionnaire survey was conducted with the aim of shedding light on its role in fostering the success of sustainable development. The survey targeted G7 contractor companies in Selangor, resulting in 77 valid responses. The data obtained from the survey underwent descriptive analysis. The survey findings revealed that the most significant challenges hindering IBSMS adoption were the shortage of construction professionals experienced in working with modular systems, logistical complexities, cost implications, complex compliance implementation procedures, and resistance to change. Addressing the complex balance between these merits and challenges is crucial for policymakers, construction professionals, and researchers in unlocking the full potential of IBSMS in sustainable development and advancing construction in Malaysia.

Downloads

Download data is not yet available.

References

Abdelmageed, S., Abdelkhalek, S., & Zayed, T. (2020). Benefits and challenges of modular integrated construction in Hong Kong: A literature review. 8th International Conference on Construction Engineering and Project Management (ICCEPM2020), 7-8. https://www.researchgate.net/publication/349965988

Al-Mayahi, H. T., Ismail, S., Wahab, M. H., Rani, W. N. M. W. M., & Amat, R. C. (2018). Architectural practices of project communication management in Iraq. Planning Malaysia, 16(1), 1–14. https://doi.org/10.21837/pmjournal.v16.i5.406 DOI: https://doi.org/10.21837/pm.v16i5.406

Aziz, S., Che Mohd Nasir, S. N., Hatrom, R., Ahmad Bazuli, L., & Abdullah, M. R. (2019). Modular construction system (MCS) in Malaysia: Mass customization through combinatorial. IOP Conference Series: Earth and Environmental Science, 385(1). https://Doi.Org/10.1088/1755-1315/385/1/012030 DOI: https://doi.org/10.1088/1755-1315/385/1/012030

Boafo, F. E., Kim, J. H., & Kim, J. T. (2016). Performance of modular prefabricated architecture: Case study-based review and future pathways. Sustainability (Switzerland), 8(6), 1–16. https://doi.org/10.3390/su8060558 DOI: https://doi.org/10.3390/su8060558

Construction Industry Development Board Malaysia, CIDB. (2019). Guideline for volumetric module house: Manufacturing design and construction for Malaysia. Kuala Lumpur: CIDB Malaysia. https://www.cidb.gov.my/wp-content/uphttps://www.cidb.gov.my/wp-content/uploads/2022/07/187-Guideline-for-Volumetric-Module-House-Manufacturing-Design-Construction-min.pdfloads/2022/07/187-Guideline-for-Volumetric-Module-House-Manufacturing-Design-Construction-min.pdf

Construction Industry Development Board Malaysia, CIDB. (2022). Construction domestic projects. Kuala Lumpur: CIDB Malaysia. https://convince.cidb.gov.my/(S(5hu51we1l5u22udmcat2wu5x))/CMS/Page/1

Egege, C. O. (2018). Off-site modular construction as a method of improving construction quality and safety. International Journal of Structural and Civil Engineering Research, 7(3), 259–268. https://Doi.Org/10.18178/Ijscer.7.3.259-268 DOI: https://doi.org/10.18178/ijscer.7.3.259-268

Hyams, A., Mccann, E., & Ferguson, H. (2018). Construction methods: Modular. Building Magazine, 46–50. https://www.building.co.uk/data/construction-methods-modular/5094760.article

Kamali, M., & Hewage, K. (2016). Life cycle performance of modular buildings: A critical review. Renewable and Sustainable Energy Reviews, 62, 1171–1183. https://doi.org/10.1016/j.rser.2016.05.031 DOI: https://doi.org/10.1016/j.rser.2016.05.031

Krejcie, R. V., & Morgan, D. W. (1970). Determining sample size for research activities. Educational and Psychological Measurement, 30(3), 607-610. https://doi.org/10.1177/001316447003000308 DOI: https://doi.org/10.1177/001316447003000308

Lawson, R. M., Ogden, R. G., & Bergin, R. (2012). Application of modular construction in high-rise buildings. Journal of Architectural Engineering, 18(2), 148–154. https://doi.org/10.1061/(asce)ae.1943-5568.0000057 DOI: https://doi.org/10.1061/(ASCE)AE.1943-5568.0000057

Lim, Y. W., Ling, P. C., Tan, C. S., Chong, H. Y., & Thurairajah, A. (2022). Planning and coordination of modular construction. Automation in Construction, 141, 104455. https://Doi.org/10.1016/j.autcon.2022.104455 DOI: https://doi.org/10.1016/j.autcon.2022.104455

Mohd Fateh, M. A., Arshad, R. A., Ahmad Marzuki, S. M., & Yusof, M. R. (2023). Improvements of the communication between consultants and contractors during the construction phase in Malaysia. Planning Malaysia. 21(26). https://doi.org/10.21837/pm.v21i26.1261 DOI: https://doi.org/10.21837/pm.v21i26.1261

Musa, M. F., Yusof, M. R., Mohammad, M. F., & Samsudin, N. S. (2016). Towards the adoption of modular construction and prefabrication in the construction environment: A case study in Malaysia. ARPN Journal of Engineering and Applied Sciences, 11(13), 8122–8131. https://www.researchgate.net/publication/305550264

Navaratnam, S., Ngo, T., Gunawardena, T., & Henderson, D. (2019). Performance review of prefabricated building systems and future research in Australia. Buildings, 9(2). https://Doi.Org/10.3390/Buildings9020038 DOI: https://doi.org/10.3390/buildings9020038

Peñaloza, G. A., Formoso, C. T., & Saurin, T. A. (2017). Resilience skills used by front-line workers to assemble precast concrete structures: An exploratory study. Ambiente Construído, 17(4), 25–43. https://doi.org/10.1590/s1678-86212017000400183 DOI: https://doi.org/10.1590/s1678-86212017000400183

Rahman, I. A., Memon, A. H., Nagapan, S., Latif, Q. B. A. I., & Azis, A. A. A. (2012, December). Time and cost performance of construction projects in southern and central regions of Peninsular Malaysia. In 2012 IEEE Colloquium on Humanities, Science and Engineering (CHUSER) (pp. 52-57). Kota Kinabalu, Malaysia. https://Doi.Org/10.1109/CHUSER.2012.6504280 DOI: https://doi.org/10.1109/CHUSER.2012.6504280

Rahman, M. M. (2014). Barriers of implementing modern methods of construction. Journal of Management in Engineering, 30(1), 69–77. https://Doi.Org/10.1061/(Asce)Me.1943-5479.0000173 DOI: https://doi.org/10.1061/(ASCE)ME.1943-5479.0000173

Said, H., Ali, A. R., & Alshehri, M. (2014, May). Analysis of the growth dynamics and structure of the modular building construction industry. In Construction Research Congress 2014: Construction in a Global Network (pp. 1977-1986). https://Doi.Org/10.1061/9780784413517.202 DOI: https://doi.org/10.1061/9780784413517.202

Subramanya, K., Kermanshachi, S., & Rouhanizadeh, B. (2020, July). Modular construction vs. traditional construction: Advantages and limitations: A comparative study. In Creative Construction e-Conference 2020 (pp. 11-19). Budapest University of Technology and Economics. https://Doi.Org/10.3311/Ccc2020-012 DOI: https://doi.org/10.3311/CCC2020-012

Wuni, I. Y., Shen, G. Q., & Mahmud, A. T. (2022). Critical risk factors in the application of modular integrated construction: A systematic review. International Journal of Construction Management, 22(2), 133-147. https://doi.org/10.1080/15623599.2019.1613212 DOI: https://doi.org/10.1080/15623599.2019.1613212

Xu, Z., Zayed, T., & Niu, Y. (2020). Comparative analysis of modular construction practices in mainland China, Hong Kong, and Singapore. Journal of Cleaner Production, 245, 118861. https://doi.org/10.1016/j.jclepro.2019.118861 DOI: https://doi.org/10.1016/j.jclepro.2019.118861