A REVIEW OF LAND ACQUISITION PROCEDURES AND COMPENSATION PRACTICES FOR THE PAN BORNEO HIGHWAY PROJECT IN SARAWAK, MALAYSIA

Authors

  • Ahmad Shazrin Mohamed Azmi Centre of Studies for Estate Management and Building Surveying, College of Built Environment, UNIVERSITI TEKNOLOGI MARA
  • Vanissa Saur Petrus Adan Centre of Studies for Estate Management and Building Surveying, College of Built Environment, UNIVERSITI TEKNOLOGI MARA
  • Nur Lesya Firsya Johaimi Ling Centre of Studies for Estate Management and Building Surveying, College of Built Environment, UNIVERSITI TEKNOLOGI MARA

DOI:

https://doi.org/10.21837/pm.v23i36.1737

Keywords:

Land Acquisition, Procedures, Compensation, Pan Borneo Highway, Sarawak

Abstract

The Pan Borneo Highway is one of the mega projects in Malaysia aimed at improving the infrastructure and enhancing connectivity in Sabah and Sarawak. With over 2000 kilometres in span, the Pan Borneo Highway project required the government to conduct massive land acquisitions and pay a huge compensation amount. Although receiving the compensation, many landowners felt it was insufficient and remained unsatisfied. Some landowners had expressed their dissatisfaction in the newspapers, which gave a negative impression of the project. This paper seeks to understand the land acquisition procedures and fair compensation determination practice in Sarawak. The qualitative research method examines the legislative resources to determine the land acquisition procedures and compensation. The study also interviewed personnel from the Land and Survey Department, Sarawak, to confirm the practice. The study discovered that the legislation is in place and clear to standardize the practice. This legislation clearly sets out the principles for determining fair compensation. The land acquisition procedures in Sarawak differentiate between land with a title deed and land under the Native Customary Rights (NCR) gazette. The paper concluded with suggestions to explore compensation principles for communal rights.

Downloads

Download data is not yet available.

References

Abdullah, A. H. (1999). Compensation for land taken under Land Acquisition Act 1960 (as amended). In Monograph on land acquisition (pp. 83–88). Valuation and Property Services Department, Ministry of Finance Malaysia.

Abdullah, I. (2022, January 6). 50 rumah terpaksa diroboh beri laluan Projek Lebuhraya Pan Borneo [50 houses have to be demolished to make way for the Pan Borneo Highway Project]. BH Online. Retrieved April 14, 2024, from https://www.bharian.com.my/berita/wilayah/2022/01/908355/50-rumah-terpaksa-diroboh-beri-laluan-projek-lebuhraya-pan-borneo

Adam, R. J. (1998). Native customary rights over land in Sarawak. Journal of Malaysian and Comparative Law, 25, 217–232.

Akob, Z., Zaidee, M., Hipni, A., & Koka, R. (2019). Coordination and collaboration of information for Pan Borneo Highway (Sarawak) via common data environment (CDE). IOP Conference Series: Materials Science and Engineering, 512(1), 012001. https://doi.org/10.1088/1757-899X/512/1/012001 DOI: https://doi.org/10.1088/1757-899X/512/1/012001

Alias, A. (2014). Pengambilan Tanah: Hak dan Panduan Pemilik Tanah. Penerbit Universiti Malaya.

Bernama. (2016, February 5). Projek Lebuh Raya Pan Borneo Hadapi Halangan [Pan Borneo Highway Project Faces Obstacles]. MStar. Retrieved April 14, 2024, from https://www.mstar.com.my/lokal/semasa/2016/02/05/halangan-projek-pan-borneo

Bernama. (2021, December 8). COVID-19, penduduk enggan pindah punca kelewatan Pan Borneo Sabah [COVID-19, residents reluctant to move causing delay of Sabah Pan Borneo]. Astro Awani. Retrieved April 14, 2024, from https://www.astroawani.com/berita-malaysia/covid19-penduduk-enggan-pindah-punca-kelewatan-pan-borneo-sabah-335313

Bernama. (2023a, October 9). Govt confident Pan Borneo Highway will be completed as promised, says Fadillah. Edgeprop.my. Retrieved January 16, 2024, from https://www.edgeprop.my/content/1907371/govt-confident-pan-borneo-highway-will-be-completed-promised-says-fadillah

Bernama. (2023b, December 7). Fed govt views seriously delay in implementation of Pan Borneo Highway in Sabah—PM Anwar. NST Online. Retrieved January 16, 2024, from https://www.nst.com.my/news/nation/2023/12/987712/fed-govt-views-seriously-delay-implementation-pan-borneo-highway-sabah-pm

Bernama. (2024, February 8). Projek Pan Borneo Sarawak dapat disiapkan tahun ini—Alexander [Sarawak Pan Borneo Project can be completed this year—Alexander]. Astro Awani. Retrieved April 14, 2024, from https://www.astroawani.com/berita-malaysia/projek-pan-borneo-sarawak-dapat-disiapkan-tahun-ini-alexander-457425

Board of Valuers, Appraisers, Estate Agents & Property Managers. (2019). Malaysian valuation standards. Board of Valuers, Appraisers, Estate Agents & Property Managers.

Buang, S. (2015). Malaysian Torrens system (2nd ed.). Dewan Bahasa dan Pustaka.

Buang, S. (2021). Land acquisition—A primer. Thomson Reuters Asia Sdn. Bhd.

Che Rose, R. A., & Imau, V. K. A. (2020). Impak sosioekonomi lebuhraya Pan Borneo terhadap komuniti tempatan [Socioeconomic impact of the Pan Borneo Highway on the local community]. Akademika, 90(1), 123–136.

Chen, S. F. (2016, May 27). Govt to bear RM2.8b cost of Pan Borneo Highway land acquisition. The Edge Malaysia. Retrieved January 16, 2024, from https://theedgemalaysia.com/article/govt-bear-rm28b-cost-pan-borneo-highway-land-acquisition

Hyett, N., Kenny, A., & Dickson-Swift, V. (2014). Methodology or method? A critical review of qualitative case study reports. International Journal of Qualitative Studies on Health and Well-Being, 9, 23606. https://doi.org/10.3402/qhw.v9.23606 DOI: https://doi.org/10.3402/qhw.v9.23606

Ikau, R. A., Rashid, A. F. A., Muhammad, W. M. N. W., & Wahi, N. (2019). A preliminary study of safety management practices on Pan-Borneo highway construction sites in Kuching, Malaysia. Journal of Physics: Conference Series, 1349(1), 012006. https://doi.org/10.1088/1742-6596/1349/1/012006 DOI: https://doi.org/10.1088/1742-6596/1349/1/012006

Land Code [Cap. 81 1958 Ed.]. Sarawak Land Code. , Chapter 81 1958 Edition § (1958).

Lorna, N. V. (2023, December 4). Land acquisition alone for Pan Borneo Highway cost RM900 mln: Fadillah. New Sarawak Tribune. Retrieved January 16, 2024, from https://www.newsarawaktribune.com.my/land-acquisition-alone-for-pan-borneo-highway-cost-rm900-mln-fadillah/

Osman, S., & Kueh, H. U. (2010, April). Land administration, land management and spatial information in Sarawak, Malaysia. Paper presented at The XXIV FIG International Congress 2010, Sydney, Australia. Retrieved from https://www.fig.net/resources/proceedings/fig_proceedings/fig2010/papers/fs03g/fs03g_osman_kueh_4572.pdf

Povera, A., & Yunus, A. (2020, July 23). Completion date for Pan Borneo Highway extended due to PDP termination. NST Online. Retrieved January 16, 2024, from https://www.nst.com.my/news/nation/2020/07/610944/completion-date-pan-borneo-highway-extended-due-pdp-termination

Toh, M. L., Tan, L. C., Tan, W. V., Ujang, M. U., & Thoo, A. C. (2019). A preliminary study on the formation of land legislation and cadastre system in Sarawak, Malaysia. International Journal of Engineering and Advanced Technology, 8(5C), 788–797. https://doi.org/10.35940/ijeat.E1112.0585C19 DOI: https://doi.org/10.35940/ijeat.E1112.0585C19

United Nations. (1948, December 10). Universal declaration of human rights. Retrieved November 8, 2024, from https://www.un.org/en/about-us/universal-declaration-of-human-rights

Usilappan, M. (1999). Land valuation—A question of determining the fair market value. In Monograph on land acquisition (pp. 51–63). Valuation and Property Services Department, Ministry of Finance Malaysia.

Utusan Borneo Online. (2016, March 30). Lebuh Raya Pan Borneo melibatkan pengambilan semula 820km tanah [Pan Borneo Highway involves the acquisition of 820km of land]. Utusan Borneo. Retrieved January 16, 2024, from https://www.utusanborneo.com.my/2016/03/30/lebuh-raya-pan-borneo-melibatkan-pengambilan-semula-820km-tanah

Vaismoradi, M., Turunen, H., & Bondas, T. (2013). Content analysis and thematic analysis: Implications for conducting a qualitative descriptive study. Nursing & Health Sciences, 15(3), 398–405. https://doi.org/10.1111/nhs.12048 DOI: https://doi.org/10.1111/nhs.12048

Wong, J. (2023, February 7). Phase two of Pan Borneo highway to start soon. The Star Online. Retrieved January 16, 2024, from https://www.thestar.com.my/business/business-news/2023/02/07/phase-two-of-pan-borneo-highway-to-start-soon

Zacchaeus, W. (2017, March 10). Kecewa dengan pampasan projek Pan Borneo [Disappointed with the compensation for the Pan Borneo project]. Utusan Borneo Online. Retrieved April 14, 2024, from https://www.utusanborneo.com.my/2017/03/10/kecewa-dengan-pampasan-projek-pan-borneo

Downloads

Published

2025-04-27

How to Cite

Mohamed Azmi, A. S., Petrus Adan, V. S., & Johaimi Ling, N. L. F. (2025). A REVIEW OF LAND ACQUISITION PROCEDURES AND COMPENSATION PRACTICES FOR THE PAN BORNEO HIGHWAY PROJECT IN SARAWAK, MALAYSIA. PLANNING MALAYSIA, 23(36). https://doi.org/10.21837/pm.v23i36.1737