A CONCEPTUAL FRAMEWORK PERFORMANCE OF IBS PRACTICES IN CONSTRUCTION PROJECT- A PLS-SEM APPROACH

Authors

  • Hazruwani A Halim Department of Civil Engineering, Faculty of Engineering and Build Environment, UNIVERSITI KEBANGSAAN MALAYSIA, BANGI, MALAYSIA
  • Adi Irfan Che Ani Department of Architecture and Build Environment, Faculty of Engineering and Build Environment, UNIVERSITI KEBANGSAAN MALAYSIA, BANGI, MALAYSIA
  • Eeydzah Aminudin Faculty of Civil Engineering, UNIVERSITI TEKNOLOGI MARA, SHAH ALAM, MALAYSIA
  • Ratih Indri Hapsari Department of Civil Engineering, STATE POLYTECHNIC OF MALANG, INDONESIA
  • Natasha Dzulkalnine Faculty of Business and Management, UNIVERSITI TEKNOLOGI MARA, PUNCAK ALAM, MALAYSIA

DOI:

https://doi.org/10.21837/pm.v23i38.1799

Keywords:

Relationship, Construction, IBS, Performance, PLS-SEM

Abstract

In Malaysia, the Industrialized Building System, or IBS, was introduced in 1963. However, the level of acceptance and performance of IBS practices among stakeholders remains relatively low compared to developed countries, despite the government's recommendation of 70% IBS usage in government projects and 50% in private projects. This study aims to develop a PLS-SEM model and to evaluate the performance of IBS practice in construction projects to replace conventional method. A quantitative research approach was adopted, where survey data from 120 participants were collected and analysed using Smart PLS software. The environment had the highest content validity (AVE) score of 0.601, according to the model evaluation, which showed adequate convergent validity and significance. Not only that, the analysis also showed that technology, organization, and environment significantly influence by the effectiveness performance of IBS practice in construction projects. The findings of this research provide valuable insights that can contribute to improving IBS practice performance in the construction industry. The performance of IBS can reduce construction waste, minimize workers and contribute significantly among contractors.

Downloads

Download data is not yet available.

References

Abd Rashid, M. N., Abdullah, M. R., Ismail, D., & Mahyudddin, M. N. (2018). 3rd International Conference On Rebuilding Place TOWARDS AUTOMATION AND ROBOTICS IN INDUSTRIALISED BUILDING SYSTEM ( IBS ): A. International Conference on Rebuilidng Place (ICRP 2018), September, 13–14.

Abdul Rahim, A., & Latif Qureshi, S. (2018a). A review of IBS implementation in malaysia and singapore AsiahAbdul Rahim 1 & Sara Latif Qureshi 2. Journal of the Malaysian Institute of Planners, 16(2), 323–333.

Abdul Rahim, A., & Latif Qureshi, S. (2018b). Journal of the Malaysian Institute of Planners (Vol. 16).

Al-Awag, A. M., Alaloul, W. S., Liew, M. S., Baarimah, A. O., & Musarat, M. A. (2023). The potential role of industrialized building systems (IBS) in Malaysian sustainable construction: Awareness and barriers. AIP Conference Proceedings, 2608(June). https://doi.org/10.1063/5.0128035

Fatimah Hashim, S., Nasrudin, asah, Norashekin Raja Othman, R., Ayu Abdullah, Y., & Zahid Mohd Salleh, M. (2023). Key factors influencing the family-friendly neighbourhood through pls-sem model assessment. Case study: ss4, Petaling Jaya, Selangor, Malaysia Centre of Studies for Town and Regional Planning, Faculty of Architecture, Planning and Surveying universiti teknologi. Journal of the Malaysian Institute of Planners VOLUME, 21(5), 4.

Hair, J. F., Hult, G. T. M., Ringle, C. M., & Sarstedt, M. (2014). A Primer on Partial Least Squares Structural Equation Modeling (PLS-SEM). Sage Publications. European Journal of Tourism Research, 6(2), 211–213.

Hair, J. F., Risher, J. J., Sarstedt, M., & Ringle, C. M. (2019). When to use and how to report the results of PLS-SEM. European Business Review, 31(1), 2–24. https://doi.org/10.1108/EBR-11-2018-0203

Irwan Hafizy Md Arif, M., Sarpin, N., Omar, R., & Mohamed, S. (2020). Penggunaan Teknologi Robotik Dalam Penghasilan Komponen Sistem Binaan Berindustri (IBS) ke Arah Revolusi Industri 4.0 dalam Sektor Pembinaan. Research in Management of Technology and Business, 1(1), 499–513. http://publisher.uthm.edu.my/periodicals/index.php/rmtb

Ismail, S., Mohamad, M. I., Zawawi, M., Nekooie, M. a, & Ismail, S. (2018). Developing a Framework for Sustainable Industrialised Building Systems for Infrastructure Projects in Malaysia. Queensland University of Technology.

Jaffar, Y., & Lee, C. K. (2020). Factors Influencing Industrialized Building S. Journal of Governance and Integrity, 3(2), 64–81. https://doi.org/10.15282/jgi.3.2.2020.5311

Jing Le, L., & Zainal, R. (2021). The Study of Industrialized Building System (IBS) Implementation in Terrace Housing Project. Research in Management of Technology and Business, 2(1), 763–775. http://publisher.uthm.edu.my/periodicals/index.php/rmtb

Khahro, S. H., Aftab, M., & Talpur, H. (2015). Attribute Hierarchy of Conflicts in Construction Projects: A Case Study of Sindh Factors Affecting Selection of Procurement Method in Public Sector Construction Projects View project Mode Choice Modelling View project. 34(4), 447–452. https://www.researchgate.net/publication/283671730

MOF. (2020). Pelaksanaan Sistem Binaan Berindustri (Ibs) Dalam Projek Kerajaan. Ministry of Finance Malaysia, 3(10), 1–5.

Nor, M., Azman, A., Hamid, Z. A., & Gomez, C. P. (2014). The selection of IBS precast manufacturing plant in Malaysia using GIS. https://www.researchgate.net/publication/260202473

Przesmycka, A., & Wieczorek, D. (2021). Maintenance Strategies, Periodic Renovations and Building Modernisation in the Aspect of the Criterion of the Whole Life Costs. Civil and Environmental Engineering Reports, 31(2), 15–29. https://doi.org/10.2478/ceer-2021-0017

Rahim, S. A. A., Hashim, M. A. S., & Shen, W. S. (2020). A Potential Study of Automation System in Industrialised Building System (IBS) in Enhancing Malaysian Construction Industry’s Performance. INTI Journal, 2020(August), 1. Ryu J, McFarland T, Banting B, Haas CT, Abdel-R. http://ez-scv.statsbiblioteket.dk:2048/login?url=https://search.ebscohost.com/login.aspx?direct=true&db=edb&AN=156605919&site=eds-live

Riazi, S. R. M., Nawi, M. N. M., & Yaziz, M. F. A. (2020). Developing a holistic project time management framework utilizing fundamental supply chain management (Scm) tools to overcome delay in malaysian public sector building projects. International Journal of Sustainable Construction Engineering and Technology, 11(1), 31–41. https://doi.org/10.30880/ijscet.2020.11.01.004

Roslan, A. F. (2022). Construction 4.0 to Transform the Malaysian Construction Industry. January.

Salhi, R., & Messaoudi, K. (2021). The Effects of Delays in Algerian Construction Projects: An Empirical Study. Civil and Environmental Engineering Reports, 31(2), 218–254. https://doi.org/10.2478/ceer-2021-0027

Sanchez-Franco, M. J., & Roldán, J. L. (2010). Expressive aesthetics to ease perceived community support: Exploring personal innovativeness and routinised behaviour as moderators in Tuenti. Computers in Human Behavior, 26(6), 1445–1457. https://doi.org/10.1016/j.chb.2010.04.023

Sarstedt, M., Ringle, C. M., & Hair, J. F. (2022). Partial Least Squares Structural Equation Modeling. Handbook of Market Research, January 2017, 587–632. https://doi.org/10.1007/978-3-319-57413-4_15

Syafiq Bahrin Bin Samsi1, M., Firdaus Bin Zainuddin2, M., Miza, F., Zain3, Y., Saidin, M. T., Mamat, M. E., Zaiwanizar, &, Abidin, Z., & Author, C. (2024). the Readiness and Challenges in the Industrialised Building System (Ibs) Adoption in Sarawak From G7 Contractors’ Perspective. Malaysian Journal of Sustainable Environment, 11(1), 25–44. https://doi.org/10.24191/myse.v11i1.985

Thomas Tarang, V. A., Mohammad, M. F., Nizam Akbar, A. R., & Mohamed, M. R. (2022). Pertinent Internal and External Issues in Industrialised Building System (IBS) Construction Business in Malaysia. Built Environment Journal, 19(1), 32. https://doi.org/10.24191/bej.v19i1.15990

Yunus, R., Hamid, A. R. A., & Noor, S. R. M. (2019). An integrated approach for sustainability in the application of Industrialised Building System (IBS). International Journal of GEOMATE, 17(61), 115–121. https://doi.org/10.21660/2019.61.4810

Yusof, M. R., Jabar, I. L., Nawawi, A. H., & Mohd Nawi, M. N. (2024). A Review of Current Issues in Industrialised Building System (IBS) for Construction Projects. Built Environment Journal, 21(1). https://doi.org/10.24191/bej.v21i1.503

Yusop, N., Irdina Muhammad Nizam, S., Norizan Wan Ismail, W., Sarah Mat Isa, S., & Jenuwa, N. (2024). INDUSTRIALISED BUILDING SYSTEM MODULAR SYSTEM (IBSMS): ADDRESSING MERITS AND CHALLENGES FOR SUSTAINABLE DEVELOPMENT SUCCESS. In Journal of the Malaysian Institute of Planners (Vol. 22).

Zhang, R., Tang, Y., Wang, L., & Wang, Z. (2020). Factors influencing BIM adoption for construction enterprises in China. Advances in Civil Engineering, 2020. https://doi.org/10.1155/2020/8848965

Zuhairi Abd Hamid;, Razuki Ibrahim;, Rohaizi Mohd Jusoh;, Mohd Rizzal Abd Ghani;, & Mazeana Che Amat; (2020). Construction 4.0 Strategic Plan (2021-2025).

Downloads

Published

2025-10-16

How to Cite

A Halim, H., Che Ani, A. I., Aminudin, E., Hapsari, R. I., & Dzulkalnine, N. (2025). A CONCEPTUAL FRAMEWORK PERFORMANCE OF IBS PRACTICES IN CONSTRUCTION PROJECT- A PLS-SEM APPROACH. PLANNING MALAYSIA, 23(38). https://doi.org/10.21837/pm.v23i38.1799