ANALYZING THE ISSUES OF E-TENDERING IMPLEMENTATION IN PUBLIC-PRIVATE PARTNERSHIP PRACTICE: A PRELIMINARY STUDY IN MALAYSIA

Authors

  • Nurul Wahida Mat Aron Center for Building, Construction & Tropical Architecture (BuCTA), Faculty of Built Environment, UNIVERSITI MALAYA
  • Faizul Azli Mohd Rahim Center for Building, Construction & Tropical Architecture (BuCTA), Faculty of Built Environment, UNIVERSITI MALAYA
  • Nur Mardhiyah Aziz Center for Building, Construction & Tropical Architecture (BuCTA), Faculty of Built Environment, UNIVERSITI MALAYA

DOI:

https://doi.org/10.21837/pm.v22i32.1501

Keywords:

Public Private Partnership, e-tendering, preliminary study, thematic analysis

Abstract

Public Private Partnership (PPP) has become a popular choice for policymakers in implementing important public projects, especially when it comes to the shortage of government funding resources and where it is necessary to counter public project inefficiency. However, the PPP tendering period, spanning from contract advertisement to contract award, tends to be lengthy due to reliance on paper-based tendering, with e-tendering not being fully utilized. Therefore, this study aims to enhance the understanding of issues related to e-tendering within the context of PPP practice in Malaysia. The research approach begins with a qualitative exploration through literature review and semi-structured interviews with five selected participants from various grades in the public sector, each possessing a minimum of three years of experience in PPP projects. The study identifies factors influencing e-tendering implementation, categorized into people, process, technology, and environment. It emphasizes the importance of IT literacy, consistent processes, suitable technology infrastructure, and organizational support. The readiness for e-tendering varies among participants, with some expressing optimism and others emphasizing the need for policy reinforcement. The outcomes of this study suggest the need for further exploration into the factors that PPP practitioners require before the implementation of an e-tendering system in PPP procurement processes.

Downloads

Download data is not yet available.

References

Aduwo, E. B., Ibem, E. O., Afolabi, A. O., Oluwnmi, A. O., Tunji-Olayeni, P. F., Ayo-Vaughan, E. A., … Oni, A. A. (2020). Exploring anti-corruption capabilities of e-procurement in construction project delivery in Nigeria. Construction Economics and Building, 20(1), 56–76. DOI: https://doi.org/10.5130/AJCEB.v20i1.6964

Ahmad, H., Abul Hassan, S. H., & Ismail, S. (2023). Transparency level of the electronic procurement system in Malaysia. Journal of Financial Reporting and Accounting, 21(3), 592–606. doi:10.1108/JFRA-07-2021-0181 DOI: https://doi.org/10.1108/JFRA-07-2021-0181

Al-Yahya, M., Skitmore, M., Cattell, D., & Bridge, A. (2018). E-tendering readiness in construction: an a priori model. Int. J. Procurement Management, 11(5), 608–638.

Alyahya, M., Skitmore, M., Cattell, D. W., Nepal, M. P., & Bridge, A. (2018). E-tendering readiness in construction: an a priori model. International Journal of Procurement Management, 11(5), 608. doi:10.1504/ijpm.2018.10014397 DOI: https://doi.org/10.1504/IJPM.2018.094356

Bala, K., & Dahiru, A. (2013). Identification of Barriers and Enablers of E-procurement Processes in PPP Projects Delivery in Nigeria. In PPP International Conference (pp. 415–422). Preston, UK.

Cazalet, B. de, & Zapatrina, I. (2021). E-Procurement for PPPs and Concessions: Current Trends and Opportunities. European Procurement and Public Private Partnership Law Review, 16(2), 131–150. doi:10.21552/epppl/2021/2/7 DOI: https://doi.org/10.21552/epppl/2021/2/7

Creswell, J. W. (2021). A Concise Introduction to Mixed Methods Research. SAGE Publications.

Das, R., Singh, L. B., & Jawed, M. (2022). Stakeholder Management in Public–Private–Partnership Projects: A Review. In Recent Advancements in Civil Engineering, Lecture Notes in Civil Engineering (Vol. 172, pp. 33–44). Springer Singapore. doi:10.1007/978-981-16-4396-5_4 DOI: https://doi.org/10.1007/978-981-16-4396-5_4

Deraman, R., Wang, C., Yap, J. B. H., Li, H., & Mohd-Rahim, F. A. (2019). Developing internet online procurement frameworks for construction firms. Future Internet, 11(6), 1–22. doi:10.3390/FI11060136 DOI: https://doi.org/10.3390/fi11060136

Fazekas, M., & Blum, J. R. (2021). Improving Public Procurement Outcomes. Review of Tools and the State of the Evidence Base. World Bank Policy Research Working Paper, (9690), 1–39. Retrieved from http://hdl.handle.net/10986/35727 DOI: https://doi.org/10.1596/1813-9450-9690

Flannery, D., Reeves, E., & Palcic, D. (2019). Public-Private Partnership Tendering Periods : An International Comparative. Journal of Economic Policy Reform, (August).

Goulding, J. S., & Lou, E. C. W. (2013). E-readiness in construction: An incongruous paradigm of variables. Architectural Engineering and Design Management, 9(4), 265–280. doi:10.1080/17452007.2013.775099 DOI: https://doi.org/10.1080/17452007.2013.775099

Hashim, H. A., Sapri, M., & Ab Azis, S. S. (2019). Strategic facilities management functions for public private partnership (PPP) healthcare services in Malaysia. Planning Malaysia, 17(1), 35–47. doi:10.21837/pmjournal.v17.i9.584 DOI: https://doi.org/10.21837/pmjournal.v17.i9.584

Hashim, N., Man, M. Y. S., Kamarazaly, M. A. H., King, L. S., Ling, S. C. A., & Yaakob, A. M. (2020). The Application of Paperless Concept in Malaysian Construction E-tendering System from QS Consultants’ Perspective. Journal of Built Environment, Technology and Engineering, 8(September), 101–110.

Issabayeva, S., Yesseniyazova, B., & Grega, M. (2019). Electronic Public Procurement: Process and Cybersecurity Issues. NISPAcee Journal of Public Administration and Policy, 12(2), 61–79. doi:10.2478/nispa-2019-0019 DOI: https://doi.org/10.2478/nispa-2019-0014

Kajendran, K. (2022). Exploring the Lesson Learnt By Implementing E-Tendering: a Review of Literature. World Construction Symposium, (June), 479–491. DOI: https://doi.org/10.31705/WCS.2022.39

Kalva, A., Brigis, G., Kruks, S., & Smits, D. (2022). Public-private partnership role during the pandemic: A case of COVID-19 testing in the Republic of Latvia 2020. International Journal of Healthcare Management. DOI: https://doi.org/10.1080/20479700.2022.2112437

Kazaz, A., Inusah, Y., & Ulubeyli, S. (2022). Barriers to E-Tendering Adoption and Implementation in The Construction Industry: 2010 – 2022 Review. In Conference: 7th International Project and Construction Management ConferenceAt: Istanbul (pp. 2010–2022).

Khaderi, S. S., Abd Shukor, A. S., Bakri, A. S., & Mahbub, R. (2019). Public Infrastructure Project Tendering Through Public Private Partnerships (PPP) – A Literature Review. MATEC Web of Conferences, 266. DOI: https://doi.org/10.1051/matecconf/201926601015

Khaderi, S. S., Bakri, A. S., Abd Shukor, A. S., Mohamad Kamil, A., & Mahbub, R. (2019). Tendering Issues and Improvement in Public Infrastructure Project Through Public-Private Partnerships (PPP)/Private Finance Initiative (PFI). In IOP Conference Series: Earth and Environmental Science (Vol. 385). DOI: https://doi.org/10.1088/1755-1315/385/1/012048

Khan, M., Mahmood, A., & Shoaib, M. (2022). Role of Ethical Leadership in Improving Employee Outcomes through the Work Environment, Work-Life Quality and ICT Skills: A Setting of China-Pakistan Economic Corridor. Sustainability (Switzerland), 14(17). doi:10.3390/su141711055 DOI: https://doi.org/10.3390/su141711055

Liu, L., Guo, Y., Chen, C., & Martek, I. (2021). Determining critical success factors for public–private partnership asset-backed securitization: A structural equation modeling approach. Buildings, 11(5). doi:10.3390/buildings11050199 DOI: https://doi.org/10.3390/buildings11050199

Maepa, D. N., Mpwanya, M. F., & Phume, T. B. (2023). Readiness factors affecting e-procurement in South African government departments. Journal of Transport and Supply Chain Management, 17, 1–12. doi:10.4102/jtscm.v17i0.874 DOI: https://doi.org/10.4102/jtscm.v17i0.874

Mehdipoor, A., Iordanova, I., Mehdipoorkalooraz, S., & Ghadim, H. B. (2023). Implementation Of Electronic Tendering In Malaysian Construction Industry: A Case Study In The Preparation And Application Of E-Tendering. International Journal of Automation and Digital Transformation, 1(1), 69–74. DOI: https://doi.org/10.54878/s2wcrx08

Mohd Som, R., Omar, Z., Ismail, I. A., & Alias, S. N. (2020). Understanding leadership roles and competencies for public-private partnership. Journal of Asia Business Studies, 14(4), 541–560. doi:10.1108/JABS-01-2019-0027 DOI: https://doi.org/10.1108/JABS-01-2019-0027

Musawa, M. S., Ismail, S., & Ahmad, H. (2017). Disclosure of public-private partnership (PPP) voluntary information Case of Malaysian PPP projects. Asia-Pacific Journal of Business Administration, 9(2), 146–163. DOI: https://doi.org/10.1108/APJBA-10-2016-0095

Nordin, R. M., Ahnuar, E. M., Masrom, M. A. N., & Ali, N. A. (2023). Examining Corruption Issues in Malaysia Construction Industry: Partaker Perspectives. Journal of the Malaysian Institute of Planners, 21(2), 52–68. DOI: https://doi.org/10.21837/pm.v21i26.1259

O’shea, C., Palcic, D., & Reeves, E. (2019). Comparing PPP With Traditional Procurement: the Case of Schools Procurement in Ireland. Annals of Public and Cooperative Economics, 90(2), 245–267. doi:10.1111/apce.12236 DOI: https://doi.org/10.1111/apce.12236

Piaw, C. Y. (2022). A Step By Step Guide PLS-SEM Data Analysis Using SmartPLS 4. Independently published.

PPP Knowledge Lab. (2021). PPP Projects in Infrastructure Malaysia. 2019. Retrieved from https://pppknowledgelab.org/countries/kenya%0A https://library.pppknowledgelab.org

Ramli, N. H., Adnan, H., Baharuddin, H. E. A., Bakhary, N. A., & Rashid, Z. Z. A. (2022). Financial Risk in managing Public-Private Partnership (PPP) Project. IOP Conference Series: Earth and Environmental Science, 1067(1), 1–10. DOI: https://doi.org/10.1088/1755-1315/1067/1/012074

Ratnawati, A., Setiawan, A., Taufik, F. F., & Mansoni, L. (2020). Transparency of Procurement Process at the Ministry of Finance Republic of Indonesia. Dinasti International Journal of Economics, Finance & Accounting, 1(2), 218–230.

Ruparathna, R., & Hewage, K. (2015). Review of Contemporary Construction Procurement Practices. Journal of Management in Engineering, 31(3), 04014038. doi:10.1061/(asce)me.1943-5479.0000279 DOI: https://doi.org/10.1061/(ASCE)ME.1943-5479.0000279

Singh, P. K., & Chan, S. W. (2022). The Impact of Electronic Procurement Adoption on Green Procurement towards Sustainable Supply Chain Performance-Evidence from Malaysian ISO Organizations. Journal of Open Innovation: Technology, Market, and Complexity, 8(2). DOI: https://doi.org/10.3390/joitmc8020061

Soong, K. K., Ahmed, E. M., & Tan, K. S. (2020). Factors influencing Malaysian small and medium enterprises adoption of electronic government procurement. Journal of Public Procurement, 20(1), 38–61. doi:10.1108/JOPP-09-2019 DOI: https://doi.org/10.1108/JOPP-09-2019-0066

Štěrbová, L., Halík, J., & Neumannová, P. (2020). Traditional Procurement versus Public-Private Partnership: A Comparison and Synergies with Focus on Cross-border Contracts. Naše Gospodarstvo/Our Economy, 66(1), 52–64. DOI: https://doi.org/10.2478/ngoe-2020-0005

Tajul Ariffin, H. L., Mohd, N. I., Mustaffa, N. E., Bandi, S., & Mei Chee, C. H. (2019). Perspectives on issues and the application of the innovative procurement approaches for the Industrialised Building System (IBS). International Journal of Built Environment and Sustainability, 6(1), 39–43. DOI: https://doi.org/10.11113/ijbes.v6.n1.328

Tan, J. J. R., & Suhaida, S. K. (2016). Application of E-Tendering in Malaysian Construction Industry. INTI International University INTI Journal Special Edition-Built Environment.

The World Bank. (2022). Benchmarking Infrastructure Development Malaysia - PPP Summary. Retrieved from https://bpp.worldbank.org/economy/MYS

Tolstolesova, L., Glukhikh, I., Yumanova, N., & Arzikulov, O. (2021). Digital Transformation of Public- Private Partnership Tools. Journal of Risk and Financial Management, 14(121). doi:10.3390/jrfm14030121 DOI: https://doi.org/10.3390/jrfm14030121

UKAS. (2023a). PPP Background. Retrieved 7 July 2023, from https://www.ukas.gov.my/en/mypartnerships/ppp/background

UKAS. (2023b). PPP Projects Lists. Retrieved 14 July 2023, from https://www.ukas.gov.my/en/mypartnerships/ppp/main-projects/ukas-s-projects-list

UKAS. (2024). Request for Proposal (RFP) Malaysian High Resolution Eath Observation Satellite Development through Public Private Partnership.

Wang, B., Liu, Y., & Parker, S. K. (2020). How Does the Use of Information Communication Technology Affect Individuals. Academy of Management Annals, 14(2), 1–73. doi:10.5465/annals.2018.0127 DOI: https://doi.org/10.5465/annals.2018.0127

Zainon, N., Lun, G. W., Zaid, N. S. M., Myeda, N. E., & Aziz, N. M. (2019). Developing a framework for life cycle assessment of construction materials through building information modelling (BIM). International Journal of Innovation, Creativity and Change, 10(7), 253–276.

Downloads

Published

2024-07-29

How to Cite

Mat Aron, N. W., Mohd Rahim, F. A., & Aziz, N. M. (2024). ANALYZING THE ISSUES OF E-TENDERING IMPLEMENTATION IN PUBLIC-PRIVATE PARTNERSHIP PRACTICE: A PRELIMINARY STUDY IN MALAYSIA. PLANNING MALAYSIA, 22(32). https://doi.org/10.21837/pm.v22i32.1501