TANGIBLE AND INTANGIBLE FACTORS INCORPORATED FOR INFRASTRUCTURE ASSET VALUATION

Authors

  • Nur Farah Hanna Mohd Rohaizad Department of Real Estate, Faculty of Built Environment and Surveying, UNIVERSITI TEKNOLOGI MALAYSIA (UTM)
  • Ezdihar Hamzah Department of Real Estate, Faculty of Built Environment and Surveying, UNIVERSITI TEKNOLOGI MALAYSIA (UTM)
  • Hariati Abdullah Hashim Centre for Real Estate Studies, Institute for Smart Infrastructure and Innovative Construction, UNIVERSITI TEKNOLOGI MALAYSIA (UTM)
  • Azizah Ismail Department of Real Estate, Faculty of Built Environment and Surveying, UNIVERSITI TEKNOLOGI MALAYSIA (UTM)

DOI:

https://doi.org/10.21837/pm.v19i17.982

Keywords:

Tangible assets, intangible assets, infrastructure asset valuation, property valuation, Malaysia

Abstract

Infrastructure asset requires high building capacity for its operations. Its functions are also linked to other infrastructures. In this light, an asset’s uniqueness in its design, operations, stakeholders’ interest, and business growth affects its overall value. Therefore, valuation is a critical component of infrastructure assets. This is because specific components incorporate the approaches for valuing assets. This paper highlights the valuation method for infrastructure assets and identifies the tangible and intangible perspectives incorporated in infrastructure asset valuation. Thus, each tangible and intangible perspective were investigated and critically detailed in this paper. Identifying the tangible and intangible components in an asset is essential because it will affect the valuation methods that will be used to value the asset. Then, it will also be affected on the final value of the asset. The research findings are derived from a critical review of literature on tangible and intangible assets. This study adopted the qualitative approach, where a series of in-depth interviews were conducted with experts to get an insight into how these tangible and intangible perspectives influence asset valuation. This paper will enrich the current body of knowledge and benefit practitioners who could apply the study’s output to real practice.

Downloads

Download data is not yet available.

References

Abdul Halim Abdul Raof (2008). Academic Report Writing (Second Edition). Petaling.

Alyami Z. (2017). Asset Valuation: A Performance Measure for Comprehensive Infrastructure Asset Management. Doctor of Philosophy in Engineering Dissertation. University of Waterloo, Canada.

Azhari Husin (1996). Harta Tanah: Kaedah Penilaian, Malaysia.

Amekudzi Kennedy (2019). Transportation Asset Valuation: Pre-Peri- and Post-Fourth Industrial Revolution. Page: 1-10 at National Academy Science.

Chen Y., Lin X. and Liu Y. (2005). Impacts of Rail Transport Construction on Land Value valuation Model and Empirical Study-case Study on Beijing Light Rail. Journalof Beijing. Jiaotong University (Social Sciences Edition). Volume 4 (3). Page 7-13.

Dojutrek, M. and Labi, S. (2012). Incorporating Asset Values in Investment DecisionMaking. Proc., 9th National Conference on Asset Management San Diego, Calif.

Falls, L.C., & Hosang, R. H (2001). Asset Valuation as a key Element Pavement Management. 5th International Conference on Managing Pavement, Seattle: Transportation Research Board.

Frischmann B. M. (2012). Infrastructure: The Social Value of Shared Resources. Oxford University Press.

Fullmer J. E. (2009). “What in the World is Infrastructure?” Infrastructure investor. Page 30-32.

Government Asset Management Policy (2009). Malaysia.

Gutek J.P (1990). Transit Terminal Valuation, The Appraisal Journal, October.

Hall. J.G (1990). Valuation of Fully Automatic Carwash, The Appraisal Journal October 1990.

Healy M.J and Berquist (1994). The sale comparison Approach and Timberland Valuation. The Appraisal Journal, October 1994.

International Valuation Standard (2013) Framework and Requirements International Valuation Standard Council. Valuation of Specialized Public services. London, United Kingdom.

Juan Diego Porras-Alvarado, Diniece Peter, Zhe Han and Zhanmin Zhang (2015) Novel Utility-Based Methodological Framework for Valuation of Road Infrastructure.

Junainah M. and Suriatini I. (2019). Capabilities of Revealed Preference Method for Heritage Property Valuation. Planning Malaysia. Journal of the Malaysian Institute of Planners. Volume 17. Issue 1. Page 377-388.

Lutzkendorf T. and Lorenz D. (2011). Capturing Sustainability-related information for Property Valuation. Building Research & Information.Volume 39 (3). Page 256 - 273.

Malaysian Valuation Standards, Sixth Edition (2019). Ramscott Academy. Board of Valuer, Appraisers, Estate Agents and Property Managers.

Mian A. S. (2019). How ICT Implementations Impact on Managing Real Estate: Directorate General State Asset Management, Ministry of Finance, Indonesia. Planning Malaysia. Journal of the Malaysian Institute of Planners. Volume 17. Issue 1. Page 350-364.

Millington A.F (1975). An Introduction to Property Valuation, London the Estate Gazette Limited.

Michelle (2012). A Methodology for Highway Assets Valuation in Indiana Department of Transportation and Purdue University).

Nick French (2004). The valuation of Specialized Property: A Review of Valuation Method (Journal of Property Investment and Finance 22 (60:533-541).

Olawore A, Otegbulu A. and Babawale GK. (2011). Valuer’s Perception of Potential Sources of Inaccuracy in Plant and Machinery Valuation in Nigeria. Property Management.

Prena Singh (2018). Performance-Based Research Implementation Management. Presented at 97thAnnual Meeting of the Transportation Research Board, Washington DC.

Pagourtzi, et al., (2003). Real Estate Appraisal: A Review of Valuation Methods. Page 386.

Ratmoko, Setiawan Herman (1997). Valuation Methodology of Airport Terminal. Master Dissertation. Universiti Teknologi Malaysia, Faculty Geoinformation and Real Estate.

Renold (1986) Hotel Asset Allocation: Separating the Tangibles Personalty.

Roubi S. (2004). The Valuation of Intangibles for Hotel Investments. Property Management. Volume 22. No.5. Page 410-423.

Shen D. and Chen S. (2012). Urban Traffic Management System Based on Ontology and Multiagent System. Service Science, Management and Engineering.

Solikin A., Abdul Rahman R., Saefruden E., Suboh N., Zahari N. H. and Wahyudi E. (2019). Forest Valuation Using Travel Cost Method (TCM): Cases of Pahang National Park and Srengseng Jakarta Urban Forest. Planning Malaysia. Journal of

the Malaysian Institute of Planners.Volume 17. Issue 1. Page 365-376.

Souza A. M., Brennand C. and Yokoyama R. (2017). Traffic Management Systems: A Classification, Review, Challenges, and Future Perspectives. International Journal of Distributed Sensor Networks.

Weldemicael E. (2017). Asset Valuation of Transportation Infrastructure: Proof of Concept in Colorado. Transportation Research Record. Washington

Yusof Y., Eves C. and Mohd Nasir A. R. (2012). Space Management in Malaysian Government Property: A Case Study. 18th Annual Pacific-Rim Real Estate Society

Conference. Adelaide, Australia.

Downloads

Published

2021-10-17

How to Cite

Mohd Rohaizad, N. F. H., Hamzah, E., Abdullah Hashim, H., & Ismail, A. (2021). TANGIBLE AND INTANGIBLE FACTORS INCORPORATED FOR INFRASTRUCTURE ASSET VALUATION. PLANNING MALAYSIA, 19(17). https://doi.org/10.21837/pm.v19i17.982

Most read articles by the same author(s)